1. Architecture overview
Purpose, scope, and design intent for this phase.
This page documents a proposed approach for the fictional GreenBox portfolio. Decisions and outcomes are illustrative until validated against business requirements, source data, security constraints, and measured implementation results.
Design area 01
Environment strategy
Design area 02
Database and schema layers
Design area 03
Compute and workload isolation
Design area 04
Security and access
2. Implementation considerations
Controls and decisions to make the design supportable, explainable, and testable.
Data movement and orchestration
Operational controls
Key design decisions
Acceptance criteria
3. Acceptance criteria and handoff
Evidence required before this phase should be considered complete.
Step 05
Next step
Build synthetic source datasets and implement the source-to-analytics path using dbt.
- Requirements and assumptions are documented and traceable.
- Business owners and technical owners are identified where applicable.
- Security, quality, and operational implications are considered.
- Validation evidence is captured; proposed designs are not presented as implemented outcomes.
← Project roadmapPrevious: Step 4 · Enterprise Data & Dimensional ModellingNext: Step 6 · Synthetic Source Data & dbt Engineering →